JAFZA Office Relocation: Gate Pass, NOC & Logistics Access

JAFZA Office Relocation: Gate Pass, NOC & Logistics Access

JAFZA office relocation is the process of moving a Jebel Ali Free Zone company from one office, warehouse or light industrial unit to another, and keeping its lease, licence and access in order while it happens. JAFZA isn’t like the tower-based free zones in the city. It’s a large gated zone split into north and south areas, with Lease Office Buildings (LOBs), the JAFZA One complex, warehouses and yards, and every person, truck and tool that enters has to pass through a gate.

That changes how you plan the move. In DIFC or JLT, the building’s facilities team is the main gatekeeper. In JAFZA, you also need the right Tasreeh gate passes, the right NOCs from JAFZA, and a logistics plan that gets trucks to the right unit inside a big, busy zone. This guide covers each of these in order.

How a JAFZA Move Differs From Other Free Zone Moves

JAFZATower-based zones (DIFC, DMCC, TECOM)
Access controlZone gates with Tasreeh passes, plus building rulesBuilding security and facilities team
Typical premisesOffices, warehouses, light industrial units, yardsOffice floors in towers
Lease handled byJAFZA, through the Dubai Trade portalLandlord or developer
Fit-out authorityTrakheesDDA, Concordia or DIFC
Typical move loadOffice furniture plus racking, stock, machineryOffice furniture and IT
VehiclesLarger trucks, forklifts, sometimes cranesStandard moving trucks

Because many JAFZA companies run an office and a warehouse together, a JAFZA relocation is often part office move, part logistics project.

Step 1: Secure the New Unit Through JAFZA

JAFZA is the landlord for most facilities in the zone, so the process starts with JAFZA, not a private landlord.

Leasing directly from JAFZA

  1. Log in to the Dubai Trade portal (dubaitrade.ae).
  2. Go to Lease and select Request for Additional Facility.
  3. Choose from the facilities JAFZA offers.
  4. JAFZA generates the lease agreement, and once it is signed you receive access and keys.

You can also contact JAFZA sales by phone (800-JAFZA) or visit the JAFZA Sales Centre at Jafza 15. JAFZA lists a processing time of 3 working days for this request.

Subleasing from another tenant

If you are taking space from an existing JAFZA company, you need a JAFZA No Objection letter to sublease. Don’t move anything into a subleased unit before that letter is in hand.

Before you sign, check:

  • The new unit suits your licence activity (office, warehouse, industrial)
  • Your visa count fits the new facility
  • Floor loading, ceiling height and power supply suit any racking or machinery you’re bringing
  • Loading dock or roller shutter access for trucks

Once the lease is in place, update your licence address details with JAFZA so your licence, establishment card and company records match the new unit.

Step 2: Fit-Out Approval From Trakhees

Fit-out in JAFZA is regulated by Trakhees, the authority that covers JAFZA and other Dubai World zones. If the new office or warehouse needs partitions, ceilings, electrical changes, mezzanines or racking installation, the drawings and works go through Trakhees, and Dubai Civil Defence and DEWA requirements still apply.

Warehouse fit-outs usually take longer than office fit-outs, because racking, fire systems and floor loading all need checking. Finish fit-out and get the completion sign-off before you book the move, so your team isn’t unloading into a unit that isn’t approved for use.

Step 3: Tasreeh Gate Passes for Movers, Trucks and Tools

Every person and vehicle entering JAFZA needs authorization at the gate. That runs through Tasreeh, the electronic gate pass system introduced by the Ports, Customs and Free Zone Corporation (PCFC).

How Tasreeh Works

  1. The visitor (for example, your moving company) creates an account on the Tasreeh platform.
  2. They build a profile and select the JAFZA company they are visiting (your company).
  3. They upload the documents the platform asks for.
  4. Your company accepts the request.
  5. The gate pass is issued by email.

Step 4 is the one that causes delays. If nobody on your side approves the requests, the crew can’t get in. Assign one person to watch for and accept Tasreeh requests in the days before the move.

Which Passes a Move Needs

JAFZA lists several pass types. For a relocation, the relevant ones are:

Pass typeValidityUsed for in a move
Day passSingle dayMoving crew on a one-day move
Visitor passOne daySupervisors, surveyors, site visits
Temporary gate passUp to 6 monthsStaff or contractors on longer projects
Tools and equipment passOne day to three monthsTrolleys, dollies, pallet jacks, tool kits
Weekly passOne weekContractors on multi-day installs
Service vehicle day passSingle daySpecific service vehicles such as waste removal

For a multi-day move, apply for passes that cover every day of the job, plus a buffer day in case something slips.

Step 4: Plan Logistics Access Inside the Zone

Delivery truck stopped at gate 2k 20260930173112

JAFZA is big, and getting from the gate to the right unit takes planning.

  • Choose the right gate. JAFZA has multiple gates serving different parts of the zone. Ask JAFZA or your facility manager which gate is best for your unit and vehicle type.
  • Check the route and dock. Confirm the loading dock position, roller shutter height, dock levellers and turning space for your truck size.
  • Book heavy equipment early. Forklifts, pallet jacks, and cranes for machinery need separate planning and sometimes separate passes.
  • Sequence office and warehouse. Move stock and racking before or after the office move, not at the same time, so trucks don’t block each other at the dock.
  • Weather and heat. Summer moves in open yards need early starts, water and shade for the crew.

Moving Out of JAFZA

If you are leaving JAFZA for the mainland or another free zone, the move becomes a licensing project. The new authority has to license the company, and staff visas usually need to be transferred or reissued. JAFZA now allows companies to re-domicile, so ask whether that route suits your company before you close anything.

Goods and equipment leaving JAFZA for the mainland may also need customs documentation. Check with Dubai Customs and JAFZA before moving stock or equipment out of the zone.

JAFZA Office Relocation Timeline

TimingTask
10 to 8 weeks beforeRequest new facility on Dubai Trade, or get sublease NOC; check visa count and floor specs
8 to 4 weeks beforeTrakhees fit-out approval and works; racking and power installation
4 to 2 weeks beforeFit-out completion; update licence address details with JAFZA; book movers and equipment
2 to 1 weeks beforeMovers submit Tasreeh requests; your company accepts them; confirm gate, route and dock
Move weekMove office and warehouse in planned sequence; set up IT
After the moveHand over old unit; update establishment card, bank, DEWA and supplier records

See our 12-week office relocation timeline for Dubai for a detailed plan.

Documents to Prepare

  • JAFZA licence and company documents
  • New lease agreement from JAFZA, or sublease plus JAFZA No Objection letter
  • Trakhees fit-out approval and completion documents, if works were done
  • Moving company’s trade licence and insurance certificate
  • Crew names and ID copies for Tasreeh
  • Vehicle plate numbers and sizes
  • Equipment list for the tools and equipment pass
  • Inventory of stock and machinery if moving a warehouse

Our office relocation checklist for Dubai covers the rest of the move.

Getting Through the Gate on Move Day

A JAFZA office relocation depends on three approvals lining up: the facility request or sublease NOC from JAFZA, Trakhees sign-off on any fit-out, and Tasreeh gate passes for every crew member, truck and tool. Add a clear route to the right gate and loading dock, and someone on your side ready to accept pass requests, and the move runs like any other. Miss one of them and the whole crew waits at the gate.

Frequently Asked Questions

How do I apply for a JAFZA gate pass for movers?

Your moving company applies through Tasreeh, the PCFC gate pass system, by creating an account, selecting your company and uploading the required documents. Your company then accepts the request, and the pass is issued by email.

What types of JAFZA gate passes are there?

JAFZA lists visitor passes, day passes, temporary passes of up to six months, permanent passes, tools and equipment passes valid from one day to three months, weekly passes, service vehicle day passes and others. A move usually needs day passes for the crew and a tools and equipment pass.

How do I move to a new facility within JAFZA?

Log in to the Dubai Trade portal, go to Lease and select Request for Additional Facility. JAFZA offers available facilities, generates the lease, and hands over access once it’s signed. JAFZA lists a processing time of 3 working days.

Do I need an NOC to sublease space in JAFZA?

Yes. Subleasing a facility from another JAFZA tenant requires a No Objection letter from JAFZA.

Who approves fit-out in JAFZA?

Trakhees approves fit-out works in JAFZA, along with Dubai Civil Defence and DEWA requirements.

Can I move my company out of JAFZA to the mainland?

Yes, but it means licensing the company with the new authority and usually transferring staff visas. Check the re-domicile option with JAFZA, and check customs requirements for any goods leaving the zone.